$3,377,433 in Year 1 Depreciation

See how an industrial real estate owner used an engineering-based cost segregation study to identify accelerated depreciation opportunities on a 100,000-square-foot distribution building.

Year 1 Depreciation

$3,377,433

Property Type

Industrial

Location

Utah

Reclassified

31.1%

Client Profile

Dave A. leads a family office that acquires and holds industrial real estate along Utah’s I-15 corridor. The group buys new or near-new distribution buildings on long-term leases and holds them for cash flow, so front-loading depreciation directly supports distributions.

The Property

A new construction, 100,000-square-foot tilt-up distribution building in the Salt Lake–Utah County industrial corridor purchased for $12,300,000 in April 2025, about $123 per square foot.

The property included a concrete tilt-up shell, 32-foot clear height, dock-high loading with levelers and seals, a 4,000-square-foot glass-front office, and a full truck court on a 6-acre site with heavy-duty paving, storm drainage, site lighting, fencing, and gates.

The building was leased to a single logistics tenant on a triple-net basis.

Purchase Price

$12,300,000

Land Allocation

$1,845,000 / 15%

Depreciable Basis

$10,455,000

Reclassified to 5 & 15 Year

$3,246,500 / 31.1%

Placed in Service

April 2025

Proposal to Final Report

8 Days

The Challenge

Industrial Looked Like a Weak Candidate

Industrial properties can look like weak cost segregation candidates because they may appear to be only a concrete box and roof. Dave’s group had been quoted a reclassification range in the high teens by another provider and wanted to know whether that was the ceiling.

Every Percentage Point Mattered

At this basis, every percentage point of reclassification represented more than $100,000 of first-year deduction, so precision mattered.

CPA Needed Clear Documentation

The group’s CPA required a report that tied directly to the construction cost breakdown provided by the developer.

CSG’s Approach

1. Proposal Within One Day

CSG returned a proposal within a day, with an estimated benefit range built from the developer’s cost breakdown and the site plan.

2. On-Site Engineering Inspection

A CSG engineer inspected the truck court, dock positions, office buildout, and utility rooms with the construction drawings in hand.

3. Engineering Cost Allocation

Engineering analysis reconciled the developer’s cost breakdown to the purchase price and allocated each line item to its MACRS class, with site work treated separately from the building.

4. Final Report in 8 Days

The final report was delivered in 8 days and formatted to the family office’s fixed asset ledger.

What the Study Found

Personal Property

5-Year Property

$1,060,000

Office buildout finishes and millwork, dock levelers, seals and bumpers, equipment-dedicated electrical, data and security cabling, and signage.

Land Improvements

15-Year Property

$2,186,500

Truck court and heavy-duty paving, parking, curb and gutter, storm drainage, site lighting, fencing and gates, landscaping, and irrigation.

Building Structure

39-Year Structure

$7,208,500

Tilt-up shell, roof, slab, fire suppression, base HVAC, and electrical service.

The Result

$3,377,433 in Year 1 Depreciation

The study identified $3,377,433 in Year 1 depreciation, about 18 times the $190,000 the building would have generated on the default schedule.

The 31% reclassification came in well above the range the group had been quoted elsewhere, driven by the size of the site work relative to the shell.

The report was delivered in 8 days and accepted by the family office’s CPA as submitted.

Why It Worked

On an industrial site, the building is only part of the basis. Truck courts, heavy paving, drainage, and site lighting are expensive and are all 15-year property. The larger the site, the larger the share of cost that never belonged on a 39-year schedule.

Key Takeaways

1

Site-to-Building Ratio Drives Results

A large truck court, heavy paving, site lighting, drainage, fencing, and gates can create major 15-year land improvement opportunities.

2

Developer Cost Breakdowns Matter

A developer cost breakdown is one of the best starting documents for a new construction cost segregation study.

3

Engineering Sets the Ceiling

Quoted reclassification ranges vary by provider because the engineering analysis, not the property type alone, determines the final result.